top of page
The Forum Theatre

KIM'S PROJECTS

THE FORUM THEATRE

Client: Marriner Group

Architect: Trethowan Architecture

Contractor: Multiplex

Location: Melbourne, Australia 

One of the many lacking aspects of heritage projects is the availability of accurate existing condition documentation. While working as the Project Director, Kim led her team to provide an accurate Revit model from extremely aged documentation, for the upgrade works of The Forum. The Revit model allowed for full integration & coordination between Architectural, Structural & MEP designers.

Hilton Hotel

HILTON HOTEL

Client: Longriver

Architect: Gray Puksand Architects

Contractor: Prebuilt

Location: Melbourne, Australia

Current industry standards have consultants all in separate work flows. Consolidation of information is now an achievable goal with Revit/BIM. While working with Prebuilt, Kim liaised with the Architect and Services Engineer, to produce a centralised set of working drawings and shop drawings for its uninterrupted Modular Construction. This helped shorten the time that would be otherwise required for documentation.

ROYAL ASCOT

Client: Castran

Architect: Plus Architecture

Contractor: Hickory

Location: Ascot Vale, Australia

Engaged by the builder, Kim led our documentation team in the implementation of a quantitative assessment by utilising BIM effectively. She achieved this by applying formulae to rebar, mesh, concrete volume and precast panel amounts within the project. Such procurement information has been highly beneficial for the builder from a cost and programme perspective. 

Royal Ascot

ESSENDON AIRPORT TERMINAL

Client: Essendon Fields

Architect: JMA Architects

Contractor: Tandem Building Group

Location: Essendon Fields, Australia

Working as the BIM Manager on this airport terminal upgrade, Kim provided the client a broader appreciation of what to expect from the development. Kim built an integratable model for the stakeholders to fully immerse themselves in an experience far greater than simply examining drawing plans. The model was used to detect clashes between the different disciplines of the project and to ensure seamless construction delivery.

Essendon Airport

Call or e-mail Kim if you would like to meet to discuss where her innovation and integration in project management can add value to your new or existing project.

​

+84 16650 62412

OR

kim@salmanmaktab.com

Copyright 2022 SALMAN MAKTAB

bottom of page